Kyrgyzaltyn OJSC
  • Contacts
  • Press Center
  • Announcements and tenders
  • Jobs
  • |
  • Kyrgyzstan-Flag (2)КЫР
  • Russia-Flag (1)РУС
  • United-Kingdom-Flag (1)ENG
  • ABOUT KYRGYZALTYN
    • About us
    • Structure
    • Management
    • Gold and Silver
    • Investments and projects
  • ASSETS OF KYRGYZALTYN OJSC
    • Manufacturing branches
      • MAKMALZOLOTO PLANT BRANCH
      • SOLTON-SARY MINE SITE BRANCH
      • TEREKSAI MINE SITE BRANCH
      • REFINING FACTORY BRANCH
    • Organization departments
      • Медицинский центр ОАО «Кыргызалтын»
      • KYRGYZALTYN HOTEL
      • JEWELRY STORE
    • Non-core branches
      • KYRGYZSKOE VZMORYE HEALTH RESORT BRANCH
      • MOTOR TRANSPORT ENTERPRISE BRANCH
      • KYRGYZALTYN – KURULUSH
    • BRANCH’S MAP
  • ENVIRONMENT AND SAFETY
  • NEWS AND IVENTS
  • LBMA

SOLTON-SARY MINE SITE BRANCH

SOLTON-SARY MINE SITE BRANCH

Solton-Sary gold deposit is located in 355 km from Bishkek City in Naryn oblast on the northern slope of Kapka-Tash ridge, at actual elevation of 3500-3600 meters above the sea level. The distance till Balykchy railway station is – 175 km, till motor road Bishkek-Torugart is – 82 km. Gold deposit consists of 3 areas — Buchuk, Ak-Tash and Altyn-Tor. The total predicted gold reserves at this deposit are about 20 tons.

Infrastructure of Solton-Sary Mine Site includes Altyntor pit with gold reserves of 543.5 kg within the bounds of the pit, beneficiation plant with productive capacity of 100 thousand tons of ore per year and auxiliary buildings and facilities.

In 1992 geological exploration works at Altyntor area were conducted by Issyk-Kul complex geological prospecting expedition. Operational exploitation of an area started in 1994 and is running up until now.

Balance reserves of gold (С1+С2) at Altyntor area were evaluated by the Territorial Reserves Committee of the Kyrgyz Republic in 2005, and are 6.97 (geologist) tons of gold, with average content of 3.48 gr./ton in an amount of 2981.1 kg of gold.

In 1997 mining operations at Altyntor area were stopped and Altyntor pit was preserved due to inexpediency of extraction under the conditions of constant reduction in prices for gold and low throughout recovery of metal. Pit was closed but beneficiation plant of Solton-Sary Mine Site was still functioning carrying out after treatment of gravity tailings. By 2001 extraction of gold reached its ceiling level under gravity limit.

Altyntor pit has been preserved since 1997 and till the beginning of 2003. The increase in prices for gold and improvement of figures related to extraction have contributed to the decision to resume mining activities at Altyn-Tor area.

Ore processing at the mill is carried out based on technology of gravity concentration with use of Knelson concentrates. Upgrading of concentrates is carried out at concentration tables. The main product is gravity concentrate with gold content of 2-2.5 kg per ton. Extraction of gold into gravity concentrate is 73-75%. Thereafter gravity concentrate is sent to another enterprise for the purpose of gold extraction, the grade of which is 99%. More than 100 kilograms of precious metal is being produced in the course of a year. Technology of gold extraction into gravity concentrate eliminates the use of chemical agents and constitutes environmentally safe method.

 

place4Address: 195 Abdumomunov Str., Bishkek, Kyrgyz Republic, 720040

 

phone72Point of contact:   +996 312 666 675
Fax: +996 312 666 700

 

 

 

sm_330
sm_330_2
sm_331
sm_332

sm_334
sm_335
sm_336
sm_337

sm_338
sm_339
sm_340
sm_341

sm_342
sm_343
sm_344
sm_345

sm_346
sm_347
sm_348
sm_349

Search
Facebook page
Follow us on Twitter
Твиты от @kyrgyzaltyn
Цены на акции Центерры в Торонто (TSX)
PRICES FOR GOLD
Котировки драгоценных металлов. Лондонский фиксинг. В долларах за грамм
Joint Ventures
  • Altynken
  • Centerra Gold
Kyrgyzaltyn OJSC strategy
Kyrgyzaltyn OJSC reporting
  • PROFIT AND LOSS STATEMENT of Kyrgyzaltyn OJSC for the period ending on September 30, 2015
  • PROFIT AND LOSS STATEMENT for the period ending on June 30, 2015
  • Annual report on financial and operating performance for 2014
  • PROFIT AND LOSS STATEMENT for the period ending on September 30, 2014
  • Financial audit for 2013
  • Operating report for 2013
  • Report for January-July 2012
  • Profit and loss statement for the 1st half-year of 2012
  • Operational and financial information for 9 months of 2012
  • Download reporting archive
Старая версия сайта
Разработка сайта MALIKOSMON.COM